Ask what is controlling progress
The plan may need to address different materials, concealed layers, contamination concerns, or continuing water entry. Have the provider identify the current limiting condition and what it will do if readings stop improving.
Request a meaningful progress update
- Which measured locations have reached the project’s goals?
- Which locations still need work or cannot yet be assessed?
- Has the equipment, access plan, or material-removal scope changed?
Plan reconstruction around the handoff
Ask for a written completion summary before scheduling work that covers affected materials. If only part of a property is ready, name that area precisely. A room that feels comfortable and an equipment pickup date are not substitutes for the underlying material assessment.