Scope and preconstruction that owners can use
Preconstruction aligns business goals with a buildable scope, trade packages, and a realistic baseline schedule. Walk the space before treating drawings as complete. Existing electrical capacity, roof/wall interfaces, concealed conditions, fire protection routing, equipment access, and occupied constraints can change sequence and cost.
The preconstruction record should state assumptions, exclusions, alternates, milestones, and responsible parties for unresolved decisions. That is how owners compare proposals without mistaking a low initial number for a complete plan. In DFW, permit review timelines, landlord design criteria, and utility coordination deserve early attention.
Separate defined work from allowances and owner-furnished items. Unknowns should be labeled—not silently absorbed into an optimistic lump sum.
- Confirm operating/occupancy date and work boundaries.
- Document existing conditions with field verification.
- Identify AHJ, landlord, and utility requirements early.
- List long-lead items before buyout optimism sets in.