Map the garage’s connections to the home
Ask the building team to document the shared wall, door, ceiling, attic connection, and any rooms above. The reconstruction scope should identify which separating assemblies and penetrations need repair and how their required function will be restored.
Assign the specialized work
Stored products can create questions outside a routine smoke-cleaning scope. Give the specialist whatever product records are available from a safe location. Establish who will evaluate and handle those materials before general demolition is authorized.
Keep the loss record distinct
- Separate vehicle and equipment inventories from building repair items.
- Record utilities serving the garage and adjoining rooms.
- Ask the insurer which policy or claim contact handles each type of property.
