Calculate from your own assumptions
Adjusted amount = area × your unit amount × your adjustment factor. Lower and upper scenarios multiply that amount by your factors and round to whole dollars. Add costs excluded from your unit amount. Results are arithmetic scenarios, not a quote or forecast.
Use the assessed work area
Enter the area associated with a defined reconstruction package and a unit amount based on that package. Do not apply one room’s finish-repair amount to structural or building-system damage elsewhere.
Understand the scenario
The calculation multiplies area by your unit amount, adjustment, and selected lower/upper factors. It does not determine the cause of damage, the correct restoration method, or insurance payment.
Keep other work packages separate
- Assessment, testing, design, and temporary protection.
- Contents handling, specialist cleaning, and remediation.
- Structural work and building systems outside the entered package.
- Approvals, inspections, and owner-requested improvements.
- Unresolved conditions that must be evaluated before authorization.